WuWa VR

Build and testing notes

One grouped session

If you received a candidate ZIP, open its BUILD GUIDE.html. It identifies the included builds, actual supplied settings and grouped checks for launch, stereo, menus, controls, first person, recording and recovery. Report pass / fail / not tried together; no repeated diagnostic-only launches are requested.

The shared-frame candidate dated 28 Sep is a local test build. Its source and package checks have passed, but foliage, prop visibility, lighting, reflections and ultimate-end eye disagreement still need visual acceptance. Full-animation headset aiming remains experimental.

Checkpoint identities

1 Oct beta (game 3.7): files, source and checksums. 26 Sep beta for the previous game version. Later local candidates are separate; a newer timestamp is not a claim of better visual results. Keep the build name, timestamp and backend hash with a report.